Late August is when the ground tells the truth and lies about it at the same time.

Third week of August, no measurable rain in a month, and the lawn crunches. Walk to the back of the yard and the clay has opened up in seams you could lose a pencil in. This is the week the phone starts. A deck corner that was fine at Memorial Day now sits low enough that the gate scrapes. A porch column has a daylight gap under its base plate. Nothing dramatic happened. The ground just got dry, shrank, and took the shallow stuff down with it.

It's also the easiest drilling of the year, and that's the trap. An auger cruises through dry ground and comes out clean, which makes a hole feel deeper and better than it is. We set depth off what the load and the freeze line demand, not off how nice the digging is on the day we happen to be there.

The dry-down, and what it takes with it

Shallow supports ride the top layer of soil, and the top layer is the part that changes the most. It swells after a wet spring, gives that volume back through a rainless summer, and freezes with whatever water is still in it come January. A house on real footings sits out all of that. A deck post on a block, a shed corner on a paver, a pergola foot cast twelve inches deep: those go along for the whole ride.

Around Olde Town we mostly see it on porches, stoops, and detached garages that were built when nobody thought a support needed a design. West Woods brings decks on sloping back yards where the downhill posts carry the most and sit in the loosest ground. And out in Candelas, Leyden Rock, and Whisper Creek the calls come faster than people expect on brand-new houses, because a post set in the backfill against a foundation is standing in dirt that's still packing itself down.

Depth is what makes the season irrelevant

Every seasonal symptom on this page has the same answer, and it's boring: get below the layer that moves and stay there. Below the freeze line so ice can't lift it, past disturbed fill so consolidation can't drop it, into material that has the bearing the load needs. Diameter answers the load. Depth answers the weather. People try to trade one for the other and it never works, because a wide shallow pad is just a bigger thing for the frost to push on.

Then we cut the ground's grip on the shaft. A smooth-sided pier gives expanding soil nothing to grab, steel ties the top of the pier to what it carries so uplift has to fight the whole assembly, and where the design calls for it a void under the load keeps swelling soil from pressing directly on concrete. That combination is why a properly built pier does the same thing in February that it did in August.

When the movement shows up, and what that timing means

The season a symptom appears narrows the cause down before we open a single hole
When you notice itWhat the ground is doingWhere the fix has to go
Late summer, a deck corner has droppedSoil giving back volume as it dries, taking shallow bearing down with itDeeper. A shim solves the symptom for one season
February into March, a post sits proudFreezing soil gripping the sides of the support and lifting itBelow the freeze line, with a shaft the ice can't hold onto
First spring on a new house, one corner dropsBackfill or fill still consolidating under a support set on top of itPast the disturbed material into ground nobody moved
It moves every year and comes backSeasonal cycling rather than outright failureStill worth fixing. Cycling racks frames and loosens every connection
It moved once, then stoppedSomething below gave way, usually a soft pocket or a washed-out voidOpen it and find the cause before any concrete goes back in
#4the smallest bar we'll tie into a footing or a pier cage
4,000 PSIair-entrained mix on anything that lives outside
28 daysto full design strength, with framing usually cleared well before that
Something in the back yard has dropped, lifted, or gone out of level

Send photos and we'll tell you whether it's a support problem or a wood problem before anybody quotes a hole. (303) 569-4046.

Drilling through an Arvada year

September through November is our favorite stretch. Ground is dry, holes stand open without sloughing, and the yard recovers before you're using it again. Late spring is the hardest: saturated clay smears on the auger, holes want to collapse, and a rig leaves ruts in a lawn that hasn't dried out from snowmelt yet.

Winter work happens and it happens more often than people think. The top foot or so is frozen, which the auger handles, and everything below it is workable. What we won't do is place concrete against frozen material at the bearing surface, so holes get drilled and poured the same day, spoils get pulled back from the edge, and cold-weather mix and protection come standard from November on. If a deck is unsafe in January, it doesn't get to wait for April.

Arvada Footings & Piers

Footings & Piers in Arvada

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Because that's when the soil under it is at its smallest volume. A rainless stretch pulls water out of the top few feet, the ground shrinks, and anything bearing shallow follows it down. Wet weather in September may bring some of that back, which is why people talk themselves out of calling. It'll be back next August, a little worse.

It's the best digging of the year, so yes for the work itself. Just don't let easy drilling talk anyone into a shallower hole. Dry ground cuts fast and stands open, which is what makes a rushed pier look fine the day it goes in and fail the next spring when moisture returns.

No, it's usually the opposite. Loose or lightly compacted fill drills quickly because there isn't much resistance in it, and that's the same reason it won't hold your load. What we want is the change: the point where the material gets stiff and the machine has to work. That's the depth the design is aiming for, and on a graded pad it can be a good bit further down than anyone guessed.

It matters a lot, and it's one of the most common things we correct on the west side. Backfill in the trench beside a foundation keeps settling for a year or more, even when it was placed in lifts. A support bearing on it goes down with it. New piers there get drilled through the backfill zone entirely and land on material that was never disturbed.

Even moisture beats swings, so light, steady watering through a long dry stretch does more good than harm. Keep it modest and off the foundation backfill. What it won't do is rescue a shallow support. Watering evens out the ride. Depth takes the structure off the ride.

That's the plan every time, and it's not a convenience thing. An open hole collects water, sloughs off the sides, and in winter lets frost work into the bearing surface. We drill, clean the bottom, set the cage, and place, all in one visit. If a hole has to sit overnight it gets covered, and it gets cleaned out again before any concrete touches it.

Not by much, and the season shapes your experience more than the number. Fall is easy on the yard and the schedule. Spring means mud and sometimes a rescheduled day. Winter adds cold-weather mix and protection. The bigger driver is always access: how far the rig has to travel, and whether it fits.
Finished concrete project at a Colorado home

Need Footings & Piers in Arvada?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.