(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Mudjacking & Slab Jacking in Westminster, Colorado
North Metro, Colorado

Westminster Mudjacking

A sunken slab isn't an eyesore first. It's the thing that catches the trash cart wheel every Tuesday.

Nobody calls us about a settled slab because of how it photographs. They call because the stroller wheel stops dead at the same spot every morning, or the trash cart tips on the way to the curb, or the garage door shows a wedge of daylight that wasn't there five years ago. Concrete failure shows up as friction in your week.

Mudjacking answers it directly. We drill a small pattern of holes through the slab and pump a wet mix of sand, portland cement, and water underneath until pressure carries the panel back level with its neighbor. Old method, still a good one. It works when the ground below can carry the weight we add, and that call gets made standing on your concrete.

The slabs you actually use, and what a lift has to hold

How a piece of concrete gets used decides how we drill it and when you get it back
Slab and how it gets usedWhat the drop does to your routineWhat the lift has to account for
Garage apron, two cars a dayTire thump at the joint, daylight under the doorWheel loads, so traffic stays off longer while slurry firms
Front walk, deliveries and kidsA lip catching toes right where nobody looks downBoth ends held flush, not just the low corner
Side walk to the gate, cart twice a weekThe cart bangs down and the lid pops every tripA narrow ribbon, easy to over-lift, so we go slow
Patio under a table and chairsWobbling legs and water standing after stormsFall restored away from the house, not merely level
Pad under the AC or a generatorEquipment out of level with the line set strainedSmall area, gentle pressure, connections watched throughout
Curb walk where the mower crossesA step between panels and a scraping deckNeighboring panels matched, since the walk reads as one run

What we're pumping, and why its weight matters

The slurry is what it sounds like: sand and cement mixed wet enough to travel down a hose and spread into a cavity. It's heavy. A cubic foot runs well past a hundred pounds, so filling a large void puts permanent mass on ground that already gave way once. Over compacted road base that's a non-issue. Over a few feet of loose fill, it's how you buy the same problem twice.

The holes are bigger than people expect. Slurry needs a port around an inch and a half across to flow at pressure, and we patch each one when we're done. They stay faintly visible. On a garage apron nobody notices. On a stamped patio you'll know, and we say so up front rather than letting you find out Saturday.

Cement also has to cure, which shapes your week more than the lift does. Foam sets in minutes. Slurry needs real time before heavy wheels cross it.

What we sort out before a single hole gets drilled

  • Probe a joint to confirm a cavity, not just a tilted panel
  • Set a string line so the target height is a measurement
  • Locate sprinkler lines, low-voltage wire, and conduit below
  • Walk your downspouts, since roof water digs most of these voids
  • Pick slurry or polyurethane based on what the subgrade can carry
  • Mark the port layout on the concrete with you standing there
Catching your foot on the same slab every day?

Lay a straight board across the low spot, photograph the gap underneath, and text it over. That one picture usually tells us the whole story.

Why we work March through November

Slurry is cement based, so it wants ground above freezing to set the way it should. That alone rules out a stretch of the calendar. The bigger problem is that frozen subgrade holds a slab artificially high while we work. Lift to that false reading in January and you inherit the original dip in April, plus a bill.

Late spring is our busy run, because winter finally shows everybody what it did. Fall is quietly the better booking. Soil moisture has evened out by September, the panel is telling the truth about where it sits, and the work gets months to settle in before a hard freeze.

Summer brings its own timing question. A cloudburst soaks a subgrade in twenty minutes, and pumping into saturated ground buys nothing you keep. When the plains storms roll through, we give it a couple of dry days and come back.

You learn more in the first ten seconds of drilling than in the whole estimate. Sometimes the bit punches through concrete and just keeps traveling through open air. Other times it hits packed gravel an inch down and we stop and rethink the job on the spot.Our crew lead, after the walkthrough

Living with the slab after we leave

A lift restores the surface. It doesn't change what moved the dirt, so your habits afterward decide whether you see us again. Get roof water out past the concrete with extensions that actually reach. Turn the sprinkler head that's been soaking the slab edge every morning. Both are cheap, and both matter more than the pumping did.

Winter care is simple. Shovel it, sand it for traction, and leave the ice melt in the garage, magnesium chloride above all. Snowblowers are fine with the skid shoes set high enough that the auger never touches concrete.

Newer streets around Bradburn and established blocks near The Ranch send us the same call for different reasons. One has trench backfill still consolidating years after somebody's utility work. The other has flatwork poured on native dirt, back when nobody put base under a walk.

Westminster Mudjacking

Mudjacking in Westminster

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Walk it as soon as the ports are patched. A car can go back the next morning in warm weather. Anything heavy waits two to three days, longer when it's cool, since the slurry is still gaining strength underneath. You get real dates rather than a rule of thumb.

Fixing the water, mostly. Voids don't appear on their own. Something carried the fines out from under that slab, and it's almost always roof discharge, an irrigation head, or a yard graded toward the concrete. We chase that down as part of the job. Where the culprit is deep loose fill instead, we say so, because slurry weight there can restart the settlement.

About an inch and a half across, set in a grid so material spreads evenly under the panel. Each gets patched with color-matched mortar, flush to the surface. On broom-finished drives they fade into the texture within a season. On colored or stamped concrete they stay visible, which is a good reason to talk about foam.

For a couple of panels, almost always, and it's faster by days. The comparison flips when most of the flatwork has moved, when the concrete is already broken into pieces, or when the ground is too soft to hold what we'd add. We'd rather call it a tear-out than take a lift we don't believe in.

Cars off the slab and off the path from the street. Pets inside, since there's a hose running and a pump making noise. Sprinklers off so the ground isn't soaked where we work. The mixer stays at the truck, and most residential jobs finish between breakfast and mid-afternoon.

Two things fight us. The mix needs ground above freezing to cure properly, and frozen soil holds the panel higher than it truly sits, so we'd level to a reading that vanishes with the thaw. If a slab is a hazard in midwinter, we'll grind the lip and book you for the first honest thaw.

Yes. Entry walks get done in sections with the route coned and open, scheduled around your busiest hours. Equipment stays compact and the hose runs where people don't. Where the walk is the only accessible route in, we split it in halves and keep one side usable throughout.
Finished concrete project at a Colorado home

Need Mudjacking in Westminster?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.