Before anybody prices a ramp, answer the cheaper question first: is this even the right door?
Almost every accessible route call starts the same way. Somebody measured a ramp, the numbers came back over, and now there's a line item nobody budgeted. The reflex is to rebuild the ramp exactly where it sits. Sometimes that's right. Often it's the pricier of two options and nobody looked at the other one.
Because the ramp isn't the thing. The route is. It starts at a parking stall, crosses a drive aisle, runs up a walk, climbs a ramp, crosses a landing, and ends at a door that has to swing without pushing anybody backward down the slope. Any link can be the reason the route fails, and on plenty of Thornton properties the cheapest fix is building the route to a door with better ground under it.
Walk out from the accessible stall and follow the path a wheelchair actually has to take. A retail building with a row of tenant doors might offer three candidates. An office suite with one entrance and a landscaped island in front of it offers exactly one, and the conversation is short.
Grade is the whole argument. A ramp only gives up so much elevation before it needs an intermediate landing, and every landing eats parking and adds demolition. A door sitting four feet above the lot means a switchback. Another door on the same building sitting eighteen inches above grade takes one short run and one landing.
Then sun, which matters more here than people expect. A north-facing entrance holds shade all winter, and a ramp there glazes over after every thaw no matter how well we build it. A workable door on the south or east side solves that permanently instead of managing it with a bucket of chloride every January.
| What you're weighing | Rebuilding where it stands | Moving the route to another door |
|---|---|---|
| Demolition and haul-off | The ramp, both landings, and usually the walk at either end | Often less demo, because you're building on walk or landscape |
| Slope you have to work with | Fixed. A tight elevation means a longer run and more landings. | Pick the friendliest grade on the building. Sometimes a switchback becomes one straight run. |
| Distance from accessible stalls | Unchanged. Fine if the stalls are close, a problem if they never were. | Stalls move too, pulling striping, signage, and drive aisle into the scope |
| Winter behavior | Same door, same shade, same drift. If it glazes every February, it keeps doing that. | A sunnier face of the building thaws on its own, which is free ice control |
| Disruption to the tenant | The entrance closes or runs on a temporary route for the duration | The existing entrance stays open the whole time, then you switch at the end |
| Wayfinding afterward | Nothing to explain. It's where it has always been. | You need clear signage or half your visitors keep walking to the old door |
| What you own in ten years | A corrected ramp on the same drainage and the same ice problem | A route on better ground, plus an old entrance you can simplify later |
We'll walk the whole route, tell you which option is actually cheaper, and put both in writing so you can take them to ownership.
A ramp is built to a tolerance measured in fractions of an inch, and it's sitting on Adams County clay that doesn't hold still. When water gets under a landing, the soil under it changes volume, and a landing that was dead level on day one develops a slope you can measure. Most of the failures we're called to correct are settlement failures, not construction failures. Somebody built a fine ramp on ground nobody managed.
So we build the dirt. Over-excavate, replace with compacted road base, run the base past the edge of the concrete so the slab isn't sitting on a shelf, and get the water headed somewhere other than the bottom landing. Then #4 bar on chairs, 4,000 PSI air-entrained mix, and joints placed where they won't create a lip on a running surface.
Season matters for this work more than for a driveway, because the tolerances are so tight and cold concrete finishes differently. Late spring through mid-October is where we'd rather be. We do build routes in cold months with heated mix water, accelerator, and blanketing, especially when a property has a hazard it can't leave in place, and we never set a ramp on frozen subgrade. On the properties we serve around Eastlake, the older stock has ramps that were retrofitted onto buildings never laid out for them, while newer pads toward North Creek Farms usually have decent geometry and settled landings. Association property in Hunters Glen tends to be about clubhouse and mail kiosk routes, which are shorter jobs and easier to schedule between seasons.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.