(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
RV & Boat Pads in Thornton, Colorado
Thornton, North Metro

Thornton RV and Trailer Pad Contractors

November through April, your rig stops being a vehicle and becomes a very heavy building.

Second week of November. The rig came home from its last trip in October, the water's blown out, the covers are on, and nothing moves until spring. Everybody calls that the off season. For the concrete underneath, it's the hard part of the year.

Six months of the same axles on the same square feet. Snow sliding off a long roof onto one strip of slab. Meltwater running under the rig at noon and freezing there at nine. Jack feet planted through every cycle. A pad that shrugs off summer can still lose the winter, and we see the results every spring in North Creek Farms and Quail Valley alike.

What winter actually does to a parked rig's slab

Start with the weight, because it doesn't move. A trailer or motorhome puts thousands of pounds through four tires and a jack foot, and unlike a car it stays put for months. The concrete handles that fine. The ground underneath creeps, and clay taking on meltwater all winter creeps faster. That's how a pad ends up dished under the tandems by April.

Then the water. An RV roof sheds a remarkable amount of snow, and all of it lands in the same two lines along the sides of the rig. On a flat pad it pools there, soaks the base at the edges, and freezes. Thirty or forty times a season at this elevation. Entrained air survives that. Nothing else does, which is why old pads look fine down the middle and chewed up along both sides.

And the rig keeps the sun off. A slab that gets no direct light in December stays frozen longer and works harder than the driveway twenty feet away.

6 inof concrete under the axles, the tongue, and the jacks
8 inof compacted base below that, placed in lifts
6%entrained air in the mix, because winter is the design case
1/8 inof fall per foot, enough to move meltwater without feeling tilted

Grading a pad for the six months it sits still

Most pads get graded for rain. We grade for melt. Rain arrives at once and leaves fast. Snowmelt is slow, it happens under the rig where nobody sees it, and it runs during the hours the surface is coldest. So fall goes one clear direction, away from the house and the fence line, and no low spot lands anywhere a jack foot might.

Where the pad meets the driveway there's a seam that takes the rig's full weight twice a trip. We thicken it and dowel the two slabs so they move as one piece instead of stepping apart over a few winters. Where the pad meets dirt, a compacted shoulder holds the edge up, because a tire parked beside an unsupported edge is a chunk waiting to break off.

One more call to make before we form: conduit. Power for a battery tender and a hose bib for spring cleaning cost almost nothing while the ground is open.

What you set between the rig and the slab for the winter

Six months in one spot. Here's what helps and what quietly causes problems
What people put downEffect on the rigEffect on the concrete
Nothing, tires straight on concreteFine one season, flat spots on a long parkBest case for the slab. Nothing traps water
Wide plastic or composite jack padsSpreads the point load instead of concentrating itGood. The one accessory we actually recommend
Scrap lumber under the jacksWorks, but soaks up water and rotsHolds a wet footprint all winter. Keep it dry, lift it in spring
Rubber mats under the tiresProtects sidewalls from cold concreteTraps moisture. Pull them at least once midwinter
Cardboard or carpet remnantsCheap, and it feels tidyWorst option here. Holds water like a sponge and stains
Tarp draped down to the slabKeeps sun off the rubberSends roof melt to the pad edge. Stop it above the concrete
Deicer on the walking laneConvenientFastest way to scale a pad. Sand does it with no damage
Rig coming home for the season?

Get the pad in while it's out on a trip. We'll measure the spot, check drainage, and quote it free.

When to build one, and how the winter calendar works

The smart play is booking the pour for a stretch when the rig is gone. Late spring through early fall is prime pouring weather anyway, and concrete that goes down during a trip means you never have to find somewhere else to park. Finish at least a month before the rig comes back, because twenty-eight days at design strength isn't a suggestion when tandem axles and a tongue jack are going on it.

We pour pads in cold weather too. Heated mix water, a chloride-free accelerator, blankets over the whole slab, scheduled between fronts. A big pad sheds heat across a lot of area and is harder to protect than a walkway, so we'll say plainly at the estimate whether April serves you better. Frozen subgrade means we don't place.

First winter, keep every kind of ice melt off, sand the walking lane instead, and hold the rig off until the twenty-eight days are done.

You can see the winter park spot from the alley in March. Two dull rectangles where the tires sat, four little rings where the jack feet were, and if the pad was poured thin, four shallow dishes to go with them.From the crew lead on these jobs
Thornton RV & Boat Pads

RV & Boat Pads in Thornton

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Winter, because that's when it sits. Measure real overall length with the tongue and rear carrier included, add a few feet of buffer for backing in at dusk, and add walking room on the door side so nobody steps into mud in February. No customer has ever told us the pad came out too big.

Six inches with tied steel across the slab, and we tighten the grid where the jack and the axles land. Four inches is a car spec, and a loaded trailer finds that out. Depth alone isn't the answer either: eight inches of compacted base under those six is what stops a rig from dishing the concrete.

More than the weight does, honestly. That line of snow becomes standing meltwater that soaks the base and refreezes nightly, which is why old pads flake along the sides while the middle looks new. We answer it with fall in one direction, entrained air, and an edge that stays supported.

If the pour lands early enough in the fall, yes. Count twenty-eight days from placement, and add margin if it turned cold during the cure, since concrete gains strength slowly in the cold. September is ready long before the rig comes home. Mid-November is a spring pad, and we'd rather tell you now.

It works if you split it in the right place. Pour concrete where the axles, tongue, and jacks land, then run compacted gravel for the approach lane only. Gravel under the load points fails every time, because a parked rig drives itself into it. Tight budget? Shrink the footprint, never the thickness.

Sweep the grit off, then wash with water and a stiff brush. For tire marks and oil, a concrete degreaser beats pressure alone, and keep a washer tip moving rather than parked, which etches the surface. Sealing it? Wait until the slab is fully cured and genuinely dry, or the film fails.
Finished concrete project at a Colorado home

Need RV & Boat Pads in Thornton?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.