Concrete Ponds & Water Features in Fort Collins, Colorado
Fort Collins, Larimer County

Fort Collins Concrete Ponds

Half the pond calls we take are about a basin somebody already owns, and the honest answer is almost always one of three.

A pond that won't hold water puts you in front of a decision most people would rather avoid. The water is going somewhere, the pump runs dry by Thursday, and every fix anyone suggests sounds either too cheap to believe or too expensive to consider. We get called to sort that out more often than we get called to build new, so let's start there.

There are three real options and no fourth one. Repair the shell you have, drop a flexible liner into it and stop fighting the concrete, or take it out and build a proper reinforced basin. Which one makes sense turns on where the water is escaping and how the thing was built in the first place. A crack at a pipe penetration is a Saturday. A floor that has cracked because the ground under it moved is a different animal, and no coating in a bucket is going to hold that shut.

6-8"reinforced wall thickness on a garden basin
7 daysof wet cure before it sees water
2pours: floor first, walls second
#4bar each way, top and bottom in the floor

Three futures for a pond that won't hold water

What each choice buys you and what you give up choosing it
OptionWhen it's the right callWhat you give up
Targeted repairLeak traced to a penetration, a joint, or a single crack in an otherwise sound shellIt's a repair. If the shell moves again, you're back with the same conversation.
Liner inside the existing shellConcrete is structurally fine but has hairline cracking all over itLiner life is finite, and rock and plants have to be placed so nothing punctures it.
Rebuild the basinFloor cracked through, walls out of plumb, or the ground beneath it never stopped movingCost and a season. You get a structure that isn't fighting itself.
Fill it inThe feature was somebody else's idea and nobody uses itThe water. Plenty of people are relieved once it's flatwork.

Why concrete ponds leak in the first place

Almost never through the middle of a wall. Water gets out at the seams and the holes. The cold joint where a floor pour meets a wall pour is the single most common escape route, because that seam is a plane between two placements that happened on different days. Put a waterstop in it and it's a non-issue for good. Leave it out and no surface product fixes it from the inside.

The second offender is every pipe that passes through the shell. Skimmer, return, bottom drain, and overflow all penetrate the concrete, and each one needs a proper collar or link seal rather than a hole with mortar packed around it. The third is shrinkage cracking, which comes from concrete that dried too fast. That's a curing failure, and our wind and dry air make it easy to cause. We wet cure pond concrete for a full week.

The fourth is the ground. A basin poured on soft or uncompacted material eventually cracks because it's spanning something that gave way, and that crack is structural, not cosmetic. That's the case where we tell people to stop buying products and rebuild.

Losing water and tired of guessing where?

We'll run a proper drawdown test, find the elevation the loss stops at, and tell you which of the three options you're actually looking at.

Winter is the load these are designed around

A pond in Larimer County spends a long stretch of the year with a lid of ice on it, and ice does two things concrete doesn't like. It expands as it forms, pushing outward against the walls, and it grabs the wall face as it grows so that any vertical movement drags on the shell. Vertical walls take the worst of it. Sloped or battered walls let an ice sheet ride up rather than push straight out, which is why we shape them that way whenever the design allows.

The freeze season here runs longer than it does south of us, so we build for it rather than around it. Steel both directions, thickness that isn't optimistic, waterstops at every cold joint, and real cover over the bar. For deeper basins we recommend running them through winter rather than draining, since water under an ice cap is a gentler load than an empty shell with frozen soil pushing on it from outside.

Build season is May into early October. Wall pours in high summer need shade cloth and constant wetting, because dry wind pulls water out of a fresh vertical face fast. Early fall is the nicest stretch of the year for this work: mild days, no afternoon storms building over the foothills, and a full cure before the first ice forms.

What goes into a pond we build

  • Subgrade proof rolled and compacted, with soft material removed rather than covered over
  • Reinforcing steel both directions in floor and walls, lapped and supported off chairs
  • Waterstop set in the cold joint between the floor pour and the wall pour
  • Pipe penetrations sleeved and sealed with collars, never mortared into a rough opening
  • Seven days of wet cure on floor and walls, covered and kept damp
  • Fill, drain, and refill before plants or fish, so any cure residue leaves with the first water
Fort Collins Ponds & Water Features

Ponds & Water Features in Fort Collins

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Shut the pump off and let it sit. If the loss stops at a certain level, the leak is right at that elevation, and it's usually a penetration or a crack you can find once the water is below it. If it keeps dropping all the way down, you're looking at the floor or the floor-to-wall seam. That test costs nothing and answers most of the question.

Up front, generally yes, and for a small ornamental feature it's often the sensible choice. Concrete costs more to build and gives you a structure that holds its shape, takes rock and edging without worry, and doesn't have a replacement date attached. On a large basin, or anywhere people and equipment will be walking, the concrete pays back.

Late spring through early fall. Wall pours are the fussy part, because a vertical face loses moisture quickly in our dry air, so mid-summer work gets shade and constant wetting. September and early October are ideal. What we won't do is pour a basin against frozen ground or try to run a week of wet cure through a freeze.

For most reinforced basins, no, and we'd rather you didn't. Water under ice is a more even load than an empty shell with wet, frozen soil pressing in from outside. Pull the pump and any equipment that could freeze, run an aerator or a de-icer if you keep fish, and leave the water in. Shallow ornamental features are the exception.

Number four bar both directions in the floor and the walls, supported on chairs so it lands in the middle of the section rather than on the dirt, with proper laps at every splice and real cover on the water face. Fiber in the mix helps control shrinkage cracks. It doesn't replace steel, and anybody offering a fiber-only pond is saving their own money.

A machine, a spoil pile, and a route to get both to the spot. We locate utilities first, strip organics out of the footprint, and over-excavate soft areas so the floor bears on something consistent. On tighter lots around Old Town, access planning is honestly the longest part of the conversation.

Often, yes, and we'll tell you when it isn't worth it. Routing and sealing a crack, resetting a penetration, or rebuilding a failed edge are all normal work. What we won't do is coat over a floor that has cracked because the ground moved and let you believe it's solved. In that case the money is better spent once, on a rebuild.