Four risers, a landing, and a rail. Small job, long list of decisions, and several of them are permanent.
Rebuilding a flight is not automatically the right move, and any contractor who quotes a tear out before walking the entry is guessing. There are cheaper answers than new concrete, and there are situations where the cheaper answers are money set on fire. Knowing which one you have takes about fifteen minutes with a level and a screwdriver.
We work on entries all over Centennial. In Southglenn and Homestead the flights are original to houses that have been through decades of freeze cycles, so the questions are about settlement and crumbling tread edges. Out around Piney Creek the entries are younger and the conversation usually turns to design: widening a narrow stoop, adding a landing, or getting rid of one awkward step nobody expects in the dark.
Start with the total rise, floor to finished walk. That one measurement sets everything else, because the risers have to divide evenly into it. Get it wrong and somebody inherits a short step at the bottom, which is exactly the step people fall on, since your foot goes where your brain expects the ground to be. Riser height gets capped near seven and three quarter inches under most codes, treads want ten inches or better, and your building department has final say.
Then width. Builder stoops are often sized to the door and nothing more, fine until two people pass or somebody carries a box. Wider is the upgrade nobody regrets. Then the landing, deep enough that a storm door swings without backing you off the edge. And the rail, worth deciding now, since anchors set into wet concrete hold and anchors drilled into a cured edge months later do not.
Here is the line we draw. If the flight is structurally intact, sitting where it was built, with even risers and no separation from the house, and the complaint is a crumbling tread nose or a sandy surface, then a partial depth repair or a bonded overlay is a reasonable buy. Surface problem, surface fix.
If the flight has moved, stop. Steps that tipped, dropped, or opened a gap where they meet the house are telling you the ground beneath them failed, and an overlay on a moving assembly is makeup on a broken bone. Same answer for cracked risers. In those cases we take it out, dig footings past frost onto soil nobody has disturbed, and rebuild. The middle case is a flight that is sound but settled as one unit, and that one can often be lifted with foam and brought back to grade in an afternoon, provided we also stop the water washing soil out from underneath it.
| Option | Works when the rise is | What you give up |
|---|---|---|
| A poured flight on footings | More than about a foot from walk to threshold | Nothing structurally. Most durable, most hand labor |
| One tall step onto a generous landing | Modest, roughly a single riser plus a bit | Flexibility later if the grading ever changes |
| A sloped walk with no steps at all | Small, with room to run the grade out | Length. It takes real distance to stay comfortable |
| Terraced landings with a step between each | Large, on an entry well above the yard | Footprint and cost. Several small pours instead of one |
Send a photo straight on, one from the side, and one of the joint where the top step meets the house. We'll give you the honest call, free.
Treads take more abuse than any other flatwork on the property. They hold melt on a horizontal surface, they get shoveled and chipped at, and they get the heaviest dose of ice melt because nobody wants a guest going down on the front steps. That is what turns a tread nose into sand. Deicer drives moisture into the top layer, the moisture freezes, and the surface pops off in scales. Sand does not do that. Use sand.
An entry rebuild wants mild weather, so our window runs April into late October. Steps are almost entirely hand work: forms, steel, one truck, a lot of finishing on a small area, and a comfortable day shows up in the finish. Cold pours are possible with warmed water, a chloride-free accelerator, and insulation left in place, but we would rather not put a January date on your front door if it can wait. Plan on several days without the entry while we stage a temporary route.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.