You can usually date a slab from the first swing of the breaker, and the date changes the whole day.
Every part of this city has a demolition personality, and we can usually call it before the trailer is unhooked. Walnut Hills, Foxridge, and Southglenn tend to hand us thin flatwork poured back when four inches counted as generous and reinforcement was whatever happened to be on the truck. Homestead and Willow Creek run somewhat heavier. Newer work around Piney Creek brings thicker drives with a real steel mat in them, which is a different animal entirely once the hammer starts.
Why should you care? Because tear-out gets priced and scheduled by weight, thickness, reinforcement, and access, never by square footage alone. A wide old patio that lifts in dinner-plate pieces can be a shorter day than a small apron with rebar tied through it. We'd rather learn which one you own while we're writing the number than at eight the next morning.
Thin slabs come apart fast and cleanly, and the surprise usually waits underneath. Pull three inches of old walk off a bed of loose sand and you're looking at ground that was never built to support anything. That's fine, we plan for it, but the prep after demolition becomes the real work: excavate to depth, bring in aggregate base, compact it in lifts, and hand back a pad that will hold what goes on top.
The second common surprise is a slab poured over a slab. Somebody in a previous decade capped a bad drive rather than removing it, and the tear-out doubles overnight in both material and trailer trips. We look for it during the estimate by checking edges and joint depths, because nobody enjoys that phone call at midday.
Then there's the stuff nobody marked. Sprinkler lines, low-voltage lighting, a gas sleeve routed under a patio by a landscaper decades after the concrete went in. We probe, we hand-dig near anything we know about, and we ask you what you remember. Your memory of the yard beats our guesswork.
Lots here are laid out generously in front and pinched in back. A driveway or front walk is straightforward: the machine works from the street, the truck parks at the curb, material goes straight into a trailer. That's the cheap version of demolition and it's a good chunk of what we do.
Backyard work is the other version. If the only route in is a side yard gate, everything changes. Smaller equipment, more passes, sometimes a wheelbarrow line, and a lot more hours. Fence panels occasionally come out and go back. We put plywood over the turf, keep machines off saturated ground, and flag sprinkler heads before anything rolls. None of that kills a project. It just has to be priced against the yard you actually have.
| What we usually find | Why it got built that way | What it means on demo day |
|---|---|---|
| Three or four inches, no steel, sand beneath | Flatwork poured quickly during a first build-out | Breaks fast, loads light, and the subgrade almost always gets rebuilt |
| A second slab capping an older one | Somebody covered a failing drive instead of removing it | Double the material and double the hauling |
| Welded wire curled through the middle | Mesh laid on the dirt and never pulled up | Tangled sheets that get cut and separated for the recycler |
| Six inches with a rebar grid | A later replacement poured to spec | Slower breaking, heavier pieces, more trailer trips |
| Flagstone or brick set in mortar over concrete | A patio remodel by a previous owner | Two materials, two disposal streams, hand work at every edge |
| Unmarked irrigation or low-voltage line | Landscaping installed years after the concrete | Probing and hand digging near known runs |
Sometimes the answer is no. Send photos and we'll tell you if a repair or an overlay buys you real years.
Demolition is the part of this trade that barely notices winter. Breaking concrete doesn't care about air temperature, and a January tear-out day is often more comfortable for the crew than an August one. Frozen subgrade is the limitation, since excavating and compacting frost-locked soil is slow and the compaction you get is not the compaction you want.
Which raises the next question: can the ground sit open? Yes, for a while. We grade it so water sheds off rather than ponding, and we'll cover it if the forecast turns ugly. What you don't want is a hole collecting runoff for two months, because saturated subgrade has to dry or be replaced before anything gets poured on it. If we're taking concrete out in December and pouring in April, we plan the site to survive that gap instead of pretending it isn't there.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.