(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Sidewalk Networks & ADA Ramps in Castle Rock, Colorado
Castle Rock, Colorado

Castle Rock ADA Ramp Contractors

Built for the wheelchair, the walker, the stroller, and the hand truck that all use the same six feet of concrete every day.

Watch your front entrance for twenty minutes on a Tuesday. A delivery driver pushes a loaded hand truck up the ramp and pauses at the top to get the door. Somebody with a walker takes it slowly and needs the landing to be genuinely flat before they can reach the handle. A parent swings a stroller wide around the bottom flare. All of them are using the same slab, and every one of them feels a quarter inch of settlement that you stopped noticing years ago.

That's the standard we build to. Not just a set of numbers on a plan, but a ramp that works in February when it's icy, works when both hands are full, and works for the person who has the least margin. Castle Rock has plenty of older commercial frontage where the ramp was added later and it shows.

1:12steepest running slope on a ramp run
2%the cross slope ceiling, and we aim under it
60"clear level landing at the top of a run
36"minimum clear width between the rails

The ramp problems we find on older Castle Rock frontage

Buildings around Plum Creek and older stretches of Founders Village were built before accessibility was designed in, so the ramp was cut into an existing walk later. Those retrofits usually pass on paper and fail in use. The run is right but the landing pitches, or the ramp meets a door that swings out over it, or the bottom dumps straight into a gutter pan that ponds.

Newer property near Metzler Ranch and Crystal Valley has cleaner geometry and a different problem: settlement. A ramp poured on ground that was never compacted underneath will drift out of tolerance within a few winters, and a compliant ramp that settles two percent is no longer a compliant ramp. That's the call we get most often, and it's a real one.

Ramp geometry we build to

The numbers that govern each piece, and what goes wrong when they slide
ElementWhat we build toWhat happens when it's off
Running slopeNo steeper than one inch of rise per twelve of runA self-propelled chair can't hold the grade, and it ices into a slide
Cross slopeTwo percent maximum across the walking surfaceChairs pull sideways, walkers lose balance, carts drift into the rail
LandingsLevel pad at least sixty inches deep, top and bottomNobody can stop to open the door without rolling backward
Clear widthThirty-six inches between rails or edgesA standard chair scrapes knuckles; a hand truck won't fit at all
Detectable warningTruncated dome panel across the full width at the street edgeA cane user gets no notice before entering the drive aisle
HandrailsBoth sides once the rise passes six inches, anchored into concreteRails work loose and become the hazard instead of the help
Surface textureLight broom run across the direction of travelSmooth troweled concrete turns into a slide the first cold morning

Winter is the real test at this elevation

A ramp is the part of your property most likely to be icy and most likely to hurt somebody when it is. Sitting above six thousand feet, Castle Rock runs through hard freeze cycles all winter, and a ramp catches sun differently than the flat walk beside it, so it melts and refreezes on its own schedule. Which is why we get fussy about two things: texture and drainage.

Broom texture goes across the walking direction, giving a wheel and a shoe something to bite. Drainage gets designed so meltwater sheets off the side rather than running down the slope and freezing at the bottom landing where everyone stops. And we build a ramp with the plow in mind, keeping the edges and flares clear of lips that a shovel or blade will catch and break.

Not sure whether your entrance still measures up?

We'll bring a smart level and check the slopes, landings, and warning panel, then tell you plainly what's out and what isn't.

What we hand back when the ramp is done

  • Slope and cross-slope readings taken on the finished concrete, written down
  • Landing dimensions at both ends, confirmed level in both directions
  • Detectable warning panel set flush, full width, correctly oriented
  • Handrail anchors set in solid concrete with the extensions in place
  • Photos of the base and steel before the pour, in case anyone asks later
  • A broom texture run across the path of travel, edges tooled without lips
  • Snow and deicer guidance for the first winter, one page, plain language

Doing it without closing the front door

Most of the ramps we replace serve the only accessible entrance a building has, so shutting it for a week isn't an option. We plan a temporary accessible route first, mark it clearly, and keep it usable through demo and cure. On some sites that means pouring in two halves. On others it means a weekend, with demo Friday evening and concrete Saturday morning.

Cure time is the piece owners underestimate. Foot traffic returns in a day or two, but we hold the route until the surface is genuinely ready; scuffing a green ramp with a loaded cart leaves marks nothing takes out.

Castle Rock ADA Ramps

ADA Ramps in Castle Rock

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

One inch of rise for every twelve inches of run is the steepest permitted, and the surface can't tip more than two percent side to side. We build with margin on both, because concrete finishes to a tolerance and a ramp poured right at the limit has nowhere to go if it settles a hair. Landings at each end have to be level and at least five feet deep.

Shovel it, early and often, and use sand for traction the first winter instead of chemicals. After that, keep magnesium chloride off it entirely; it's the roughest deicer in circulation around here and ramps take the worst of it. Plastic-edged shovels, no steel scraping. If you contract the plowing, put the ramp handling in the scope in writing.

They're required where a ramp meets a vehicle route, so curb ramps into a drive aisle or parking lot need them. Truncated dome panels give a cane user and a low-vision user physical notice that the pedestrian area is ending. They run the full width of the ramp at the bottom. Interior ramps and ramps that don't touch traffic generally don't need them.

Quite possibly. Compliance is measured on the concrete as it sits today, not as it was poured, so a landing that has tipped past two percent is out of tolerance regardless of what the original plan said. The good news is that a settled landing on a sound slab can sometimes be lifted back into position rather than removed. We measure first and tell you which one you're looking at.

Foot traffic in twenty-four to forty-eight hours in normal weather, and we'll hold it longer if the pour ran late or the nights are cold. Wheeled loads, carts, and hand trucks wait a full week. Handrail anchoring happens after the concrete has strength, so on a two-stage job the rail day is separate. You get the reopen times before we mobilize.

Yes, and it's most of the ramp work we take on. A temporary accessible route gets laid out before demo starts, signed and barricaded, so there's always a compliant way into the building. Loud demolition happens outside business hours wherever the site allows. Give us your busiest windows and the sequence gets built around them.

No. We do single ramps constantly, often as the last item on somebody's compliance punch list. Per square foot a small job runs higher, since mobilization costs the same either way, so mention any other concrete needing attention and we'll fold it into the same trip. A lone ramp is still worth the call.
Finished concrete project at a Colorado home

Need ADA Ramps in Castle Rock?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.