The geotech report is the drawing that actually matters. We build to it, not around it.

Every commercial foundation is really two projects. One of them is visible: forms, steel, concrete, inspections, a shell the steel erector or the framing crew can start on. The other one gets buried before anybody shows up with a camera, and it decides whether the finished building spends its first decade quiet or cracked.

Under a slab that behaves, there's a sequence. Topsoil and organics stripped off. Subgrade proof rolled, then accepted or dug out. Structural fill brought to the right moisture and compacted in lifts, each one tested. Clean rock as a capillary break. A vapor retarder lapped and sealed at every pipe. Only then do the bars go down. Skip a step and you get the calls we get in Highlands Ranch: curled joints chewing up under wheel traffic, a damp patch under brand new flooring, a dock approach that stepped down half an inch in year two.

95%standard compaction we build structural fill to
10 milvapor retarder under any conditioned slab
6"slab thickness where delivery trucks turn and stop
3inches of cover on steel cast against soil

Everything under the slab, in order

Proof rolling is the part owners never watch and should. A loaded truck runs the pad and we watch for pumping, that soft rolling wave in the subgrade that means the material won't hold anything. Where it pumps, it comes out. Where it holds, fill goes on top in lifts thin enough that a compactor can actually reach the bottom of them, at a moisture content the testing lab checks rather than one the operator eyeballs.

We do this work on light commercial, multi-family, and mixed-use sites all over the south end of the county, including the buildings that serve Westridge, Southridge, BackCountry, and The Hearth. Utility trenches are the sleeper problem. Sewer, water, and conduit get cut through a pad that was already compacted, then backfilled by whoever was closest to the excavator at quitting time. A year later there's a crack running the exact path of the pipe. We recompact trench lines to the same standard as the rest of the pad and we bed the pipe properly, because a slab telegraphs everything below it eventually.

Reading the soils report and answering it

Common geotechnical findings on South Metro sites and what the design does about each
Finding in the reportWhat it threatensHow the design answers
High swell potential in the upper strataA lightly loaded slab gets lifted from belowStructural floor over void form, or remove and replace with non-expansive material
Low bearing capacityFootings sized for the load get impractically wideDrilled piers down to a competent layer, grade beams carrying the walls between them
Groundwater near bearing depthExcavations fill, and walls take long-term pressureUnderdrain to daylight or a sump, and a waterproofing system rather than damproofing
Uncontrolled fill across part of the siteHalf the footprint settles while the other half staysDig it out, or pier through it so the whole building bears on the same material
Sulfates in the soilCement paste in buried concrete degrades over timeSulfate resistant cement and a tighter water to cement ratio anywhere concrete touches dirt

Before we order the first truck

  • Topsoil and organics stripped and stockpiled or hauled, not mixed back into the pad
  • Proof roll witnessed, with soft areas marked and excavated instead of covered
  • Fill moisture conditioned and compacted in lifts, with density tests as we climb
  • Trench lines bedded, backfilled, and recompacted to the same spec as the pad
  • Clean rock capillary break screeded flat so slab thickness stays honest
  • Vapor retarder lapped, taped, and detailed tight at pipes, columns, and edges
  • Reinforcing set on chairs and cover checked in every direction before anyone walks it
  • Testing lab confirmed for the pour date so cylinders and air tests happen on schedule
Send us the geotech report and the foundation plan

We'll price the earthwork, the concrete, and the schedule as separate line items. Call (303) 569-4046.

Winter builds and keeping a tenant open

Commercial work here runs year round because leases don't care about weather. Winter is when shells go up, since owners want doors open by summer. Cold pours are routine for us: warm concrete, blankets or enclosures, ground thawed where it has to be, and temperature logged rather than assumed. What actually costs days in January isn't the concrete, it's the dirt. Frozen spoil piles, a thaw cycle turning the pad to soup, and a drill rig waiting on a haul truck.

The other schedule problem is the business that has to stay open. A retail pad or a small office serving Northridge and Eastridge shoppers usually can't lose its whole parking field or its only service door, so we phase it. Half the area at a time, temporary access maintained, pours set for nights or weekends where noise and traffic demand it. That takes more planning and it saves the tenant more than it costs. Late summer into fall is the calmest window for phased work; the ground is dry, the days are long, and cure times are short.

Highlands Ranch Building Foundations

Building Foundations in Highlands Ranch

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

If anything moisture sensitive goes on top, absolutely. Flooring adhesives, coatings, and sealed floors under racking all fail when vapor drives up through concrete. A 10 mil sheet, lapped and taped, sealed at every penetration, sitting on clean rock. The cost is a rounding error next to tearing out finished flooring in year two and doing it again.

It follows axle loads and frequency. Cars and light vans are fine at four inches over a properly built base. Box trucks, delivery vehicles, and anything pulling a trailer want five to six inches with heavier steel and tighter joint spacing. Dock approaches and dumpster pads get their own design, because the point loads from truck jacks and fork wheels are severe.

The owner usually retains the testing lab and we work to their schedule instead of around it. Compaction tests as fill goes in, cylinder breaks on each placement, slump and air checked at the truck. Our job is calling for tests early enough and covering nothing that hasn't been looked at. Reports stay with the job file and get handed over at closeout.

Most of ours does. Concrete in cold weather is a solved problem with heated water, accelerators, blankets, and enclosures. The variables that bite are excavation and haul-off, because frozen material moves slowly and a thaw turns access roads to mud. We build float into winter schedules for dirt work, not for concrete.

Curling starts when a slab's upper surface dries well ahead of its underside, so edges lift and joint shoulders break down under hard wheels. Wet mixes, thin sections, weak curing, and unfilled joints all make it worse. We fight it with a stiffer mix, real curing, and a semi-rigid joint filler in any area that sees forklift traffic.

Earthwork, nearly every time. How much soil leaves the site, whether it gets replaced with imported material, and whether the design goes to drilled piers instead of spread footings. After that: wall height, waterproofing scope, winter conditions, and how tight the site is for equipment and concrete trucks. Building area is far down the list.

Foot traffic the next day. Rubber-tired equipment around a week. Loaded racking, forklifts, and hard-wheeled traffic wait for 28 days unless cylinder breaks come back strong sooner, and we will pull an early break when the schedule needs the number. Joint filling gets pushed as late as the build allows so most shrinkage is behind us.