Heavy pads for bins, tanks, and equipment.
Farm concrete earns its keep. A grain bin, a tank, or a piece of equipment sits on a pad for decades and loads it hard, so we pour reinforced, level pads sized for the weight and set to drain.
Steeper, rockier ground means grading and drainage drive the design. We plan for runoff and frost so the work stays put. For grain bin & ag equipment pads, that local knowledge is exactly what protects your investment. We plan the base, drainage, reinforcement, and finish around the conditions on your Golden property, not a generic detail.
We serve every part of Golden and the surrounding area, including Genesee, Mesa Meadows, Applewood, Village at Mountain Ridge. Wherever you are in Jefferson County, the crew shows up with the same standard.
At roughly 5,675 feet, Golden gets intense high-altitude sun and a freeze and thaw cycle that is hard on any concrete poured without care. For ag & grain bin pads, that means air-entrained mixes, deliberate curing, control joints cut on time, and a base prepared for the expansive clay under your property. It is the difference between work that holds for decades and work that starts failing by the first or second spring.
We build the pad to carry a full bin or a loaded tank, with the thickness, rebar, and base compaction the weight calls for. A ring wall or anchor pattern goes in exactly where the bin needs it.
Out on the plains, water and freeze work on anything poured flat and forgotten. We slope the pad to shed water, use air-entrained mixes, and cut joints so it holds up through the seasons.
Every Golden job starts with a free, written estimate and a structural engineer on staff for the work that needs one. Licensed, bonded, and insured, with finishes from a clean broom texture to stamped, colored, and sealed.
You always know what is happening and what it costs before we mix a single yard. Here is the path from first call to final walkthrough.
We visit the site, measure, check drainage and soil, and hand you a clear written quote. No charge, no pressure.
We set the grade, thickness, reinforcement, and finish. Structural work gets engineered and permitted.
Forms, rebar, and a clean pour. We screed, float, and finish to the texture you picked, then cut control joints.
You can walk it in 24 to 48 hours. We walk the job with you and explain how to care for it through the first winter.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.